-
Match the complete marking
Include 3BHE041626R0101 PDD405 A101 and any revision or assembly number visible on the item. Keep the exact reference on your enquiry and quotation.
-
Check the offered item before ordering
Request available label, connector and optical-link photos. Have your maintenance team compare the offered 3BHE041626R0101 PDD405 A101 with the installed equipment and applicable ABB documentation.
Technical specifications for 3BHE041626R0101 PDD405 A101
-
Manufacturer:ABB
-
Product Category:General Automation
-
Spare Part Number:3BHE041626R0101 PDD405 A101
-
Weight:1.25 kg
-
Tariff Code:8537101190
-
Assembly designation:PD D405 A101 control hub
-
Documented hub slots:Five in the identified ABB project parts list
-
Documented host:ACS580MV control-compartment arrangement
-
Power connection:X1; +24 V label in the ACS580MV hub drawing
-
Signal connection:X2 in the ACS580MV hub drawing
-
Optical-link positions:Y1–Y4 in the ACS580MV hub drawing
-
Hub mounting:Eight fixing screws in the ACS580MV service procedure
-
Daughter-board arrangement:Separate daughter boards occupy hub slots
Information
- For 3BHE041626R0101 PDD405 A101, service planning starts with the installed converter build, daughter-board population and connection map; the identified ABB project assembly has five hub slots.
Configuration boundary: Daughter-board population must match the installed converter
Service focus: Preserve the original optical and wired connection map
In the ACS580MV arrangement, the hub connects to power, signal and optical links while its daughter boards occupy dedicated locations. Those host drawing labels help identify the removed assembly, but they do not establish a universal pinout or electrical rating for every 3BHE041626R0101 PDD405 A101 execution.
Before replacement, identify the converter build and record the fitted board population, cable routing and connector locations. An approved maintenance sequence isolates and grounds the drive, switches off control-compartment breakers, disconnects the relevant links and connectors, then releases the hub fixing screws. Recommission the installed configuration under the site procedure after reassembly.
-
ABB 3BHE041626R0101 PDD405 A101 technical reference
Apter Power technical reference - PDF, 2 pages. Control-hub identity, documented interfaces and host-system boundary. -
ABB 3BHE041626R0101 PDD405 A101 installation guide
Prepared by Apter Power - PDF, 2 pages. Isolation, connection mapping, replacement sequence and acceptance checks.
Compatibility scope: Physical placement alone does not establish interchangeability across hub revisions or converter builds.
-
ACS580MV control compartment
Use as the PD D405 hub position in an ACS580MV build that specifies the matching assembly and fitted boards. -
Daughter-board integration
Carry the project-selected daughter boards in the control hub, preserving each installed slot assignment. -
Optical control interconnection
Maintain the documented optical-link routing between the hub positions and their paired boards or drive equipment. -
Installed-system restoration
Replace a like-for-like hub within a verified converter configuration, then validate the restored control path during commissioning.
Stop, de-energize and ground the drive under the site procedure before entering the control compartment.
Switch off the applicable control-compartment circuit breakers before disconnecting the hub.
Label each fiber link and protect its end faces; reconnect by the recorded position map.
Identify and protect the pressure tube during removal, then confirm its original routing after refit.
Hold the assembly while releasing the documented fixing screws; protect daughter boards and connectors from strain.
Use the approved converter start-up and diagnostic procedure to confirm the restored installed configuration.
Alternative Names
Technical notes
Identity scope: ABB project parts list identifies 3BHE041626R0101 as PD D405 A101 control hub with five slots.
Platform scope: ABB ACS580MV hardware instructions describe the PD D405 hub arrangement and service steps. Match the offered A101 execution to the installed converter before applying a host procedure.
Connection scope: X1, X2 and Y1–Y4 are positions in the documented host drawing; the drawing is not a complete offered-unit electrical specification.
FAQ View All FAQ
-
Can 3BHE041626R0101 PDD405 A101 replace a different PD D405 revision without an engineering review?The available records do not establish revision interchangeability. Compare both full order codes, board populations and the converter project drawings before approving a substitution.
-
How should daughter-board slot assignments be preserved when servicing 3BHE041626R0101 PDD405 A101?Record the installed slot, daughter-board identification and cable route for each position before removal. Refit to the approved as-built configuration rather than relying on a visually similar board arrangement.
-
Does a fiber-link alarm prove that 3BHE041626R0101 PDD405 A101 is faulty?No. Inspect the optical path, mating boards, connection positions and applicable converter diagnostics before attributing a fault to the hub.
-
What should be compared if the replacement 3BHE041626R0101 PDD405 A101 has a different pressure-tube connection layout?Pause the replacement and compare the original assembly, host drawing and current revision. Do not reroute or omit the tube on the basis of physical fit alone.
-
Can existing daughter boards be transferred to a new 3BHE041626R0101 PDD405 A101 hub?Transfer requires confirmation of board identity, condition, slot assignment and host compatibility under the approved service procedure. The hub order code alone does not verify the daughter boards.
-
Which control records should be retained before changing 3BHE041626R0101 PDD405 A101?Retain the converter identity, current fault record, hub and daughter-board markings, optical-link mapping and approved configuration record for comparison after reassembly.
-
What would justify a follow-up diagnostic review after 3BHE041626R0101 PDD405 A101 is fitted?Unexpected optical-link, board-recognition or control-compartment indications after start-up require comparison with the pre-service record and the host diagnostic procedure.
-
Does fitting 3BHE041626R0101 PDD405 A101 require a universal calibration procedure?The available ABB material does not establish a single calibration routine for every host build. Apply the converter-specific commissioning and diagnostic checks required by the installed control configuration.
Supporting new and legacy automation
-
Please try to be as accurate as possible with your search.
-
We can quote you on 1000s of specialist parts, even if they are not listed on our website.
-
We can't find any results for “”.
You May Also Like
Product Browsing History
-
Whatsapp: +86 18030235313
Send us a message. -
sales13@apterpower.com
Complete our online form. -
+86 18030235313
Speak to our team in your native language.






