Speak to a sourcing specialist
sales13@apterpower.com

CC-ZHR041

UHIO-2 C300 and Control Firewall Migration Kit
In Stock
Ships by Friday, November 6
Fast Shipping Available
Product image is representative; revision or series may vary. Contact us to request a specific version.

Product Describe:

Honeywell CC-ZHR041 is uhio-2 c300 and control firewall migration kit. It is the UHIO-2 migration kit that accommodates redundant C300 controllers and redundant nine-port Control Firewalls in a horizontal cabinet arrangement.
Get a quick price for CC-ZHR041
E-mail *
Mobile *
Company
Content *
Quantity *
Upload (gif, jpg, jpeg, png, bmp, doc, docx, xls, xlsx, ppt, pdf, csv)
For more information on how your data is processed and stored by Apterpower please read our privacy policy

What happens after you enquire

  • 1

    Requirement review

    We review the part number, quantity and delivery requirements and ask for any missing details.
  • 2

    Quotation and availability

    We confirm the proposed item, condition, availability, price and estimated lead time in the quotation.
  • 3

    Order confirmation and dispatch

    Once the quotation and purchasing details are agreed, your contact will coordinate the order and available dispatch information.

Technical specifications for CC-ZHR041

  • Manufacturer:
    Honeywell
  • Product Category:
    Machinery Monitoring Systems
  • Spare Part Number:
    CC-ZHR041
  • Estimated shipping dimensions:
    23.8x13.5x2.0cm
  • Weight:
    0.35 kg
  • Tariff Code:
    8537101190
  • Counliy of origin:
    USA
  • Assembly type:
    UHIO-2 migration kit
  • Controller arrangement:
    Redundant C300
  • Firewall arrangement:
    Redundant 9-port Control Firewall
  • Installed sets:
    Two C300/CF9 sets

Information

Overview Manuals Common Applications Product Precautions
Honeywell CC-ZHR041 is uhio-2 c300 and control firewall migration kit. It is the UHIO-2 migration kit that accommodates redundant C300 controllers and redundant nine-port Control Firewalls in a horizontal cabinet arrangement.
  • Combines two C300/Control Firewall hardware sets
  • Supports a redundant controller architecture
  • Provides a horizontal migration mounting arrangement
  • Retains the documented UHIO-2 cabinet interface

CC-ZHR041 operates with two C300 controllers, two nine-port Control Firewall modules, horizontal IOTA/mounting hardware, FTE and cabinet cabling.

Engineered applications include Legacy cabinet C300 migration, Redundant controller modernization, Horizontal I/O cabinet retrofit, C300/CF9 service assembly renewal.

Important Notice: Confirm the complete CC-ZHR041 kit contents, horizontal mounting position, paired controller/firewall identities, FTE cabling and redundant node assignment before power-up.

Apter Power CC-ZHR041 Manuals and Guides

Apter Power CC-ZHR041 Product and System Technical Reference PDFApter Power CC-ZHR041 Field Installation and Functional Acceptance Workbook PDF

The first document organizes model-specific identity, technical data and system context. The second provides a separate installation, connection, commissioning and acceptance workflow.

Legacy cabinet C300 migration

Introduces redundant C300 control into the documented cabinet footprint.

Redundant controller modernization

Maintains two controller paths during a modernization project.

Horizontal I/O cabinet retrofit

Adapts the controller/firewall set to horizontal mounting hardware.

C300/CF9 service assembly renewal

Restores the complete migration assembly rather than mixing individual layouts.

Read the applicable Honeywell instructions before work. Verify CC-ZHR041 and the installed Experion Series-C UHIO-2 configuration.
1

Verify the complete CC-ZHR041 marking and its assigned UHIO-2 migration-kit position before work.

2

Place the connected process and control strategy in the approved maintenance state.

3

Isolate the applicable cabinet supply and controller and network field energy before disconnecting conductors.

4

Record terminal numbers, channel assignments, polarity, shields and configured ranges before removal.

5

Use ESD controls and protect the backplane connector, terminal hardware and coated electronics.

6

Confirm the installed paired C300 and CF9 modules and carrier arrangement against the approved project.

7

Restore power in a controlled sequence and clear only diagnostics created by the maintenance activity.

8

Complete redundancy, switchover and FTE communication tests and retain the measured result before returning the channel to automatic service.

Technical notes

Confirm the complete CC-ZHR041 kit contents, horizontal mounting position, paired controller/firewall identities, FTE cabling and redundant node assignment before power-up.

FAQ View All FAQ

  • What exact Honeywell system position is intended for CC-ZHR041?
    CC-ZHR041 is assigned to the documented Experion Series-C UHIO-2 role as uhio-2 c300 and control firewall migration kit; confirm that role against the installed cabinet record.
  • Which field signal or controlled function is handled by CC-ZHR041?
    Its documented signal duty is redundant c300 control and fte interface arrangement. The controlling source lists controller arrangement as Redundant C300.
  • Which companion hardware must be checked before installing CC-ZHR041?
    Match CC-ZHR041 with two C300 controllers and two nine-port Control Firewall modules; also retain the approved carrier, cable and project identity.
  • What electrical limit should an engineer verify before wiring CC-ZHR041?
    Verify the model-specific value for Installed sets: Two C300/CF9 sets. Do not transfer a limit from another module revision.
  • How should the installed configuration be preserved when replacing CC-ZHR041?
    Record the as-found slot, connector, channel assignment and project revision, then restore only the approved Experion Series-C UHIO-2 configuration.
  • Which isolation or handling check applies to CC-ZHR041?
    Apply the isolation and ESD sequence stated for CC-ZHR041; the source also identifies installed sets as Two C300/CF9 sets.
  • What diagnostic or commissioning evidence is required for CC-ZHR041?
    Complete the model-specific functional check for legacy cabinet c300 migration, review host diagnostics and retain the final test result.
  • Can CC-ZHR041 be substituted for a visually similar Honeywell assembly?
    No automatic substitution is assumed. Compare the complete CC-ZHR041 marking, assembly type, companion hardware, signal duty and approved system revision.
Related reading

Related cases and sourcing guidance

View all case studies
Manufacturers

Product Browsing History

Revisit the products you recently viewed on Apter Power.
SPEAK TO OUR TEAM
Let’s find the right solution for you.
Send us the part number, quantity and delivery destination. Our team will help confirm availability and lead time.
  • Whatsapp: +86 18030235313

    Send us a message.
  • sales13@apterpower.com

    Complete our online form.
  • +86 18030235313

    Speak to our team in your native language.