Speak to a sourcing specialist
sales13@apterpower.com

CC-TCNT01 51308307-175

C300 Controller IOTA
In Stock
Ships by Friday, November 6
Fast Shipping Available
Product image is representative; revision or series may vary. Contact us to request a specific version.

Product Describe:

Honeywell CC-TCNT01 51308307-175 is the input/output termination assembly for a C300 controller. It provides the mechanical, backplane-power and network termination interface used by the compatible C300 controller module.
Get a quick price for CC-TCNT01 51308307-175
E-mail *
Mobile *
Company
Content *
Quantity *
Upload (gif, jpg, jpeg, png, bmp, doc, docx, xls, xlsx, ppt, pdf, csv)
For more information on how your data is processed and stored by Apterpower please read our privacy policy

What happens after you enquire

  • 1

    Requirement review

    We review the part number, quantity and delivery requirements and ask for any missing details.
  • 2

    Quotation and availability

    We confirm the proposed item, condition, availability, price and estimated lead time in the quotation.
  • 3

    Order confirmation and dispatch

    Once the quotation and purchasing details are agreed, your contact will coordinate the order and available dispatch information.

Technical specifications for CC-TCNT01 51308307-175

  • Manufacturer:
    Honeywell
  • Product Category:
    DCS Systems
  • Spare Part Number:
    51308307-175
  • Estimated shipping dimensions:
    12x14.5x5.2cm
  • Weight:
    0.18 kg
  • Tariff Code:
    8537101190
  • Counliy of origin:
    USA
  • Hardware type:
    C300 Controller IOTA
  • Companion controller:
    CC-PCNT01
  • Supply:
    24 Vdc
  • IOTA current at 24 Vdc:
    0 A
  • IOTA heat dissipation:
    0 W

Information

Overview Manuals Common Applications Product Precautions
Honeywell CC-TCNT01 is a c300 controller iota for compatible Honeywell control and I/O systems.
  • System role: C300 Controller IOTA
  • Integration focus: Compatible Honeywell host and termination hardware
  • Replacement focus: Exact assembly, revision and connector match
  • Commissioning focus: Wiring, diagnostics and functional response

Use CC-TCNT01 only with the exact Honeywell host, rack or chassis, companion hardware, cable and project configuration specified for the installed system.
Confirm the complete physical label, system hardware, field connections and project documentation before installation or replacement.

Important Notice: Confirm whether the matching terminal assembly, cable, connector, power accessory, software and current Honeywell documentation are included in the quotation or stock description.

Apter Power CC-TCNT01 Manuals and Guides

Important Notice: These are two separate Apter Power documents prepared from product-specific Honeywell technical information. Confirm the physical nameplate, installed-system requirements and supplied accessories before configuration or installation.

CC-TCNT01 installed-base maintenance
Like-for-like service of the documented C300 Controller IOTA.
CC-TCNT01 compatibility review
Comparison of host hardware, companion module, revision, field wiring and configuration before replacement.
CC-TCNT01 installation planning
Preparation of isolation, ESD, connector, terminal and cabinet checks before field work.
CC-TCNT01 commissioning
Controlled verification of power, status, channels, communications, diagnostics and process response.
Read the applicable Honeywell installation instructions before work. Verify CC-TCNT01 and the installed-system configuration.
1
Verify CC-TCNT01 and the complete part number on the physical nameplate before installation.
2
Confirm that the installed Honeywell platform and companion hardware support the C300 Controller IOTA function.
3
Isolate all applicable power and field energy before removing or installing CC-TCNT01.
4
Use ESD controls and protect the connectors, terminals and printed-circuit assembly of CC-TCNT01.
5
Record the existing wiring, jumpers, switches, firmware and configuration before replacement.
6
Do not transfer ratings, wiring or configuration from a similar Honeywell model to CC-TCNT01.
7
Torque and dress field wiring to the applicable cabinet and termination instructions for CC-TCNT01.
8
After installation, test power, diagnostics, channels, alarms, communication and the intended process function of CC-TCNT01.

Technical notes

De-energize and secure the controller position before IOTA work.

FAQ View All FAQ

  • How should an engineer verify zero-IOTA current entry on CC-TCNT01?
    Use the CC-TCNT01 technical limit or configuration stated for zero-IOTA current entry, then verify it at the installed channel before service.
  • What must be checked for CC-PCNT01 pairing on CC-TCNT01?
    Treat CC-PCNT01 pairing as a product-specific commissioning point and compare the field condition with the Honeywell hardware configuration.
  • Which system detail controls controller seating on CC-TCNT01?
    The required check concerns controller seating; confirm the connected hardware is the matched component listed for CC-TCNT01.
  • Why is it important to confirm connector-pin inspection on CC-TCNT01?
    For connector-pin inspection, isolate the circuit, record its present configuration and apply the stated Honeywell limit before re-energization.
  • Where should the team validate 24 Vdc cabinet distribution on CC-TCNT01?
    Validate 24 Vdc cabinet distribution directly at the termination or module position and confirm the controller channel reports the same state.
  • What record is required for network restoration on CC-TCNT01?
    The engineering record for CC-TCNT01 should include network restoration, the installed wiring identity and the final functional-test result.
  • How can a configuration mismatch affect redundant position labeling on CC-TCNT01?
    Check redundant position labeling against the selected system arrangement; a mismatch can affect channel recognition or field response.
  • What is the final commissioning test for post-service controller status on CC-TCNT01?
    Complete post-service controller status with a controlled field stimulus and retain the result as the return-to-service baseline.
Related reading

Related cases and sourcing guidance

View all case studies
SPEAK TO OUR TEAM
Let’s find the right solution for you.
Send us the part number, quantity and delivery destination. Our team will help confirm availability and lead time.
  • Whatsapp: +86 18030235313

    Send us a message.
  • sales13@apterpower.com

    Complete our online form.
  • +86 18030235313

    Speak to our team in your native language.