Match the 1.0 m probe to the documented 25 mm Proximitor Sensor system length and mounting arrangement. Verify side-exit clearance, armor routing, target geometry and final gap before commissioning.
Important Notice: Confirm quotation scope, physical marking, included accessories and installed-system compatibility before work.
Important Notice: The first document is an Apter Power model-specific technical reference; the second link is the unmodified official manufacturer publication.









