Speak to a sourcing specialist
sales13@apterpower.com

GJR5143100R0001 35EK90

Level Coupler Unit
In Stock
ABB GJR5143100R0001 35EK90
ABB GJR5143100R0001 35EK90
ABB GJR5143100R0001 35EK90
ABB GJR5143100R0001 35EK90
ABB GJR5143100R0001 35EK90
ABB GJR5143100R0001 35EK90
Product image is representative; revision or series may vary. Contact us to request a specific version.

Product Describe:

ABB GJR5143100R0001 35EK90 is a Procontic T300 level coupler used at the basic subrack in a multi-subrack control arrangement.
  • Manufacturer part number
    GJR5143100R0001 35EK90
  • Shipping
    Swift global dispatch
  • Condition
    New, original product
  • Shipping size (est.)
    2cm x 19.5cm x 26.1cm
  • Country of Origin
    Sweden
Get a quick price for GJR5143100R0001 35EK90
E-mail *
Mobile
Company
Content *
Quantity *
Upload (gif, jpg, jpeg, png, bmp, doc, docx, xls, xlsx, ppt, pdf, csv)
For more information on how your data is processed and stored by Apterpower please read our privacy policy

What happens after you enquire

  • 0

    Review your reference

    Send the full GJR5143100R0001 35EK90 marking, cabinet layout, coupler photographs and required quantity.

  • 1

    Confirm the offer

    Confirm the offered revision, connector condition, included parts and basic-subrack application in the quotation.

  • 2

    Arrange dispatch

    Agree quantity, dispatch date and delivery details in the quotation.

  • Match the complete marking

    Match the full GJR5143100R0001 35EK90 marking and connector positions with the installed basic-subrack coupler. Identify the 35 EK 91 extension units and 35 SK 96 links from the cabinet drawing.

  • Check the offered item before ordering

    Request complete-label and connector photographs. Compare the offered unit, condition and included parts with the installed Procontic T300 subrack arrangement before ordering.

Technical specifications for GJR5143100R0001 35EK90

  • Manufacturer:
    ABB
  • Product Category:
    DCS Systems
  • Spare Part Number:
    GJR5143100R0001 35EK90
  • Weight:
    0.32 kg
  • Tariff Code:
    8537101190
  • Device function:
    Level coupling
  • ABB system:
    Procontic T300
  • Coupler location:
    Basic subrack
  • Extension coupler:
    35 EK 91
  • Interconnection:
    35 SK 96
  • Illustrated subrack count:
    4 (planning example)
  • Illustrated end termination:
    Matching resistors at lower and upper ends
  • Subrack supervision:
    Separate from level coupler

Information

Overview Downloads Applications / Compatibility Product Precautions
  • The 35 EK 90 device occupies the basic-subrack end of the T300 coupling path. Extension subracks use 35 EK 91 units and 35 SK 96 links in the ABB planning arrangement.
Subrack position: 35 EK 90 is shown at the basic subrack, not at an extension level.
Interconnection: 35 SK 96 links connect the basic and extension-subrack couplers.
System boundary: Subrack supervision is implemented separately from the level coupler.
ABB’s T300 cabinet planning drawing places the 35 EK 90 at the lower connection of the basic subrack. In the depicted four-subrack arrangement, extension levels use 35 EK 91 couplers; this role difference matters when identifying a replacement location.

The connection drawing uses 35 SK 96 links between levels and shows matching resistors at the lower 35 EK 90 and upper 35 EK 91 ends. The installed number of levels and termination arrangement must be read from the approved cabinet design.

ABB states that the level couplers do not provide subrack supervision. Monitoring of processor and subrack operation is a separate system function; after an exchange, verify the coupling path and the independent supervision response using the site procedure.
Controller platform reference: ABB Procontic T300 multi-subrack system. Use the approved cabinet drawing to confirm the basic and extension-subrack positions.
The ABB Procontic T300 planning excerpt shows the 35 EK 90 basic-subrack position, 35 EK 91 extension couplers and 35 SK 96 interconnection. A separate field guide covers identification and exchange checks.
The original ABB planning excerpt and separate Apter Power field guide serve different purposes. Check the installed Procontic T300 cabinet design and ABB instructions before a change.
Prepare ABB GJR5143100R0001 35EK90 for its configured installation using these checks.
Record the full marking

Photograph GJR5143100R0001 35EK90 and its connector side before removal.

Map every subrack

Label the basic subrack and each extension level in the as-found cabinet.

Protect end termination

Retain the approved matching-resistor arrangement at the two ends of the coupling chain.

Inspect link cables

Check each 35 SK 96 connection and strain relief against the approved drawing.

Separate supervision checks

Do not treat coupler continuity as proof of subrack or processor monitoring.

Prove the restored system

Verify inter-subrack communication and independent supervision after the exchange.

Alternative Names

ABB GJR5143100R0001 35EK90 level coupler unit ABB Procontic T300 35 EK 90 GJR5143100R0001

Technical notes

Evidence scope: ABB planning data identify the 35 EK 90 device and topology; the complete GJR suffix must be checked on the available unit.

Topology: 35 EK 90 belongs to the basic subrack; extension levels use 35 EK 91.

End termination: ABB shows matching resistors at the lower and upper ends of a four-subrack coupling path.

Monitoring: Level couplers do not themselves supervise the subracks.

FAQ View All FAQ

  • Why is GJR5143100R0001 35EK90 placed at the basic-subrack end?
    ABB’s T300 planning arrangement uses the 35 EK 90 at the basic level and 35 EK 91 at extension levels. Compare the cabinet drawing before assigning a replacement position.
  • How should the extension couplers be checked before replacing GJR5143100R0001 35EK90?
    Map every 35 EK 91 unit and its order above the basic subrack, then compare the cable route with the approved layout.
  • What is the role of 35 SK 96 when checking GJR5143100R0001 35EK90?
    It forms the illustrated link between levels. Record every installed cable and connector position before removal.
  • Does GJR5143100R0001 35EK90 provide subrack supervision?
    No. ABB describes separate processor and subrack monitoring; prove that function independently after restoring coupling.
  • How should end termination be checked around GJR5143100R0001 35EK90?
    Compare the installed matching-resistor positions with the approved cabinet drawing; the ABB four-level example places them at the lower and upper ends.
  • What should be photographed before removing GJR5143100R0001 35EK90?
    Capture the complete marking, connector orientation, adjacent cable labels and basic-subrack position so the restored arrangement can be compared.
  • How can a failed inter-subrack link after installing GJR5143100R0001 35EK90 be isolated?
    Check the lower coupler connector, 35 SK 96 links, extension couplers and end termination in order before changing controller settings.
  • What acceptance evidence should follow a GJR5143100R0001 35EK90 exchange?
    Record the restored cabinet topology, link-cable identities, communication response and separate supervision result under the site procedure.
SPEAK TO OUR TEAM
Let’s find the right solution for you.
Send us the part number, quantity and delivery destination. Our team will help confirm availability and lead time.
  • Whatsapp: +86 18030235313

    Send us a message.
  • sales13@apterpower.com

    Complete our online form.
  • +86 18030235313

    Speak to our team in your native language.