Match the complete marking
Match the full GJR5143100R0001 35EK90 marking and connector positions with the installed basic-subrack coupler. Identify the 35 EK 91 extension units and 35 SK 96 links from the cabinet drawing.
-
Check the offered item before ordering
Request complete-label and connector photographs. Compare the offered unit, condition and included parts with the installed Procontic T300 subrack arrangement before ordering.
Technical specifications for GJR5143100R0001 35EK90
-
Manufacturer:ABB
-
Product Category:DCS Systems
-
Spare Part Number:GJR5143100R0001 35EK90
-
Weight:0.32 kg
-
Tariff Code:8537101190
-
Device function:Level coupling
-
ABB system:Procontic T300
-
Coupler location:Basic subrack
-
Extension coupler:35 EK 91
-
Interconnection:35 SK 96
-
Illustrated subrack count:4 (planning example)
-
Illustrated end termination:Matching resistors at lower and upper ends
-
Subrack supervision:Separate from level coupler
Information
- The 35 EK 90 device occupies the basic-subrack end of the T300 coupling path. Extension subracks use 35 EK 91 units and 35 SK 96 links in the ABB planning arrangement.
Interconnection: 35 SK 96 links connect the basic and extension-subrack couplers.
System boundary: Subrack supervision is implemented separately from the level coupler.
The connection drawing uses 35 SK 96 links between levels and shows matching resistors at the lower 35 EK 90 and upper 35 EK 91 ends. The installed number of levels and termination arrangement must be read from the approved cabinet design.
ABB states that the level couplers do not provide subrack supervision. Monitoring of processor and subrack operation is a separate system function; after an exchange, verify the coupling path and the independent supervision response using the site procedure.
GJR5143100R0001 35EK90 ABB Procontic T300 Planning Excerpt
Original ABB subrack layout and connection diagrams applicable to the 35 EK 90 device. PDF · 2 pages.GJR5143100R0001 35EK90 Installation & Verification Guide
Subrack mapping, cable and termination inspection, and return-to-service checks. PDF · 1 page.
Application scope: Confirm the installed topology, 35 EK 91 extension units, 35 SK 96 links and end termination before selection.
Basic-subrack coupling
Use the 35 EK 90 position shown at the lower end of the T300 cabinet connection drawing.Extension-subrack chain
Identify the 35 EK 91 couplers above the basic level and retain their original order.Cabinet interconnection
Match the installed 35 SK 96 linking cables and connector positions to the approved drawing.Service replacement
Record existing end termination and prove the restored coupling path and separate supervision.
Photograph GJR5143100R0001 35EK90 and its connector side before removal.
Label the basic subrack and each extension level in the as-found cabinet.
Retain the approved matching-resistor arrangement at the two ends of the coupling chain.
Check each 35 SK 96 connection and strain relief against the approved drawing.
Do not treat coupler continuity as proof of subrack or processor monitoring.
Verify inter-subrack communication and independent supervision after the exchange.
Alternative Names
Technical notes
Evidence scope: ABB planning data identify the 35 EK 90 device and topology; the complete GJR suffix must be checked on the available unit.
Topology: 35 EK 90 belongs to the basic subrack; extension levels use 35 EK 91.
End termination: ABB shows matching resistors at the lower and upper ends of a four-subrack coupling path.
Monitoring: Level couplers do not themselves supervise the subracks.
FAQ View All FAQ
-
Why is GJR5143100R0001 35EK90 placed at the basic-subrack end?ABB’s T300 planning arrangement uses the 35 EK 90 at the basic level and 35 EK 91 at extension levels. Compare the cabinet drawing before assigning a replacement position.
-
How should the extension couplers be checked before replacing GJR5143100R0001 35EK90?Map every 35 EK 91 unit and its order above the basic subrack, then compare the cable route with the approved layout.
-
What is the role of 35 SK 96 when checking GJR5143100R0001 35EK90?It forms the illustrated link between levels. Record every installed cable and connector position before removal.
-
Does GJR5143100R0001 35EK90 provide subrack supervision?No. ABB describes separate processor and subrack monitoring; prove that function independently after restoring coupling.
-
How should end termination be checked around GJR5143100R0001 35EK90?Compare the installed matching-resistor positions with the approved cabinet drawing; the ABB four-level example places them at the lower and upper ends.
-
What should be photographed before removing GJR5143100R0001 35EK90?Capture the complete marking, connector orientation, adjacent cable labels and basic-subrack position so the restored arrangement can be compared.
-
How can a failed inter-subrack link after installing GJR5143100R0001 35EK90 be isolated?Check the lower coupler connector, 35 SK 96 links, extension couplers and end termination in order before changing controller settings.
-
What acceptance evidence should follow a GJR5143100R0001 35EK90 exchange?Record the restored cabinet topology, link-cable identities, communication response and separate supervision result under the site procedure.
Supporting new and legacy automation
-
Please try to be as accurate as possible with your search.
-
We can quote you on 1000s of specialist parts, even if they are not listed on our website.
-
We can't find any results for “”.
Related cases and sourcing guidance
View all case studiesYou May Also Like
Product Browsing History
-
Whatsapp: +86 18030235313
Send us a message. -
sales13@apterpower.com
Complete our online form. -
+86 18030235313
Speak to our team in your native language.