Board number, commercial article, converter execution and harness orientation are matched before a supervised low-risk run verifies the repaired interface.
Important Notice: Complete the converter discharge procedure and photograph every harness position before removing the board.
The technical reference separates board identity, interface role and converter relationship; the field guide covers isolation, connector inspection, first energization and controlled run testing.