Get Parts Quote
Name
Company *
Phone *
Email *
Address
City
State / Province / Region
Zipcode
Country
Quantity *
Part Number *
Manufacturer
Preferred Condition
Additional Information
Cancel

SPA-ZC 402

SPA to IEC 61850 Gateway
In Stock
Ships by Wednesday, September 9
Fast Shipping Available

Product Describe:

ABB SPA-ZC 402 is a SPA-to-IEC 61850 gateway that connects one fibre-optic SPA IED to an IEC 61850 station bus. It also permits SPA protocol access over TCP/IP through the same Ethernet connection.

Ask our team:

Get a quick price for: SPA-ZC 402
Quantity*
Upload (gif, jpg, jpeg, png, bmp, doc, docx, xls, xlsx, ppt, pdf, csv)
For more information on how your data is processed and stored by Apterpower please read our privacy policy.

Technical specifications for SPA-ZC 402

Technical specifications for SPA-ZC 402

  • Manufacturer:
    ABB
  • Product Category:
    DCS System
  • Spare Part Number:
    SPA-ZC 402
  • Estimated shipping dimensions:
    19x11.3x3.5cm
  • Weight:
    0.46 kg
  • Tariff Code:
    8537101190
  • Counliy of origin:
    Sweden
  • IED optical interface:
    ST multimode glass pair; snap-in multimode plastic pair
  • Ethernet optical connectors:
    LC multimode; MT-RJ multimode
  • Ethernet copper connector:
    RJ-45, STP CAT5e
  • Auxiliary power option A:
    100-240 VAC; 110-220 VDC
  • Auxiliary power option C:
    24-60 VDC
  • Continuous service temperature:
    -10...+55 deg C
  • Short-term temperature range:
    -40...+85 deg C
  • Transport and storage temperature:
    -40...+70 deg C
  • Contact ESD test level:
    8 kV

Information

Information

Overview Manuals Common Applications Product Precautions
SPA-ZC 402 bridges one optical SPA device into an IEC 61850 station bus and provides a coordinated engineering path for configuration, reporting and diagnostics.
  • Converts the connected IED's SPA information into IEC 61850 services
  • Supports station-bus reporting, controls and disturbance-record access
  • Allows SPA protocol access over the active Ethernet network
  • Uses CET for device modeling, datasets, report controls and CID downloads

The gateway is installed near a protection IED, with a fibre-optic SPA cable on the device side and an Ethernet switch on the station-bus side. It supports substation automation projects that integrate protection indications, controls, measurements, events and disturbance records from a SPA-based IED.

Important Notice: Use one SPA device per SPA-ZC 402 loop and verify the complete execution code, auxiliary-power option, Ethernet interface, IED connectivity package and CID file before start-up.

Apter Power SPA-ZC 402 Manuals and Guides
Apter Power SPA-ZC 402 Product Technical Reference PDFABB SPA-ZC 402 Installation and Commissioning Manual PDF
The first document is an Apter Power model-specific technical reference. The second is the directly related ABB installation and commissioning manual used for engineering verification.
SPA relay IEC 61850 gatewayConnects one installed SPA protection IED to a station-level IEC 61850 network.
SPACOM 300 rack integrationTreats a configured SPACOM 300 rack as one SPA device behind the gateway.
Disturbance-record retrievalTransfers recorder files from the connected protection device for engineering analysis.
Station upgrade with retained IEDAdds modern station-bus communications while keeping the existing SPA-connected device.
Read the applicable ABB installation instructions before work. Verify SPA-ZC 402 and the installed-system configuration.
1Record the complete SPA-ZC 402 ordering code so the protocol, Ethernet connector, SPA fibre and power option remain matched.
2Isolate both auxiliary power and the connected protection equipment before terminal or fibre work.
3Connect the protective-earth conductor to the dedicated casing screw before applying auxiliary power.
4Do not connect multiple separate SPA devices in one SPA loop; configure a larger rack as the single device defined by ABB.
5Keep optical fibres clean, correctly paired and within the planned installation route and bend radius.
6Back up the active CET project, device model, datasets, report controls and exported CID file before modification.
7Verify the selected IED connectivity package and adapter firmware combination before downloading a configuration.
8After installation, review the documented LED sequence and prove SPA, LAN and IEC 61850 communication under controlled conditions.

Alternative Names

Alternative Names

SPA-ZC402

Technical notes

Technical notes

Mount SPA-ZC 402 on the cubicle wall or floor near the IED, keeping the fibre-optic SPA cable within the engineered route and length. Complete protective earth and auxiliary-power wiring before connecting the SPA fibre and LAN path, then commission only one SPA device per adapter loop.

FAQS

  • How many SPA devices should be connected to one SPA-ZC 402?
    ABB permits one SPA device on the adapter loop; a configured SPACOM 300 rack is treated as one device.
  • Where should SPA-ZC 402 be mounted inside a cubicle?
    Mount it on the cubicle wall or floor near the protection relay, with the fibre-optic SPA cable length and routing considered before drilling.
  • Which auxiliary-power version of SPA-ZC 402 is required for an existing panel?
    Read the complete ordering code and match the panel supply to option A or C before any terminal connection.
  • How is SPA-ZC 402 connected between an IED and the station bus?
    Connect the IED with the specified optical SPA pair and connect the selected LAN interface to the station-bus Ethernet switch.
  • What must be backed up before reconfiguring SPA-ZC 402?
    Retain the CET project, IED data model, datasets, report-control settings, communication parameters and exported CID file.
  • How should a SPA-ZC 402 configuration error be diagnosed?
    Review the Diagnostic LED sequence, verify the downloaded CID content, inspect the error log and simplify or correct any mismatched configuration.
  • What compatibility checks apply when replacing SPA-ZC 402?
    Match the protocol execution, Ethernet connector, SPA optical hardware, auxiliary-power range, firmware, CET version and IED connectivity package.
  • How is SPA-ZC 402 commissioned after installation?
    Confirm protective earth and power polarity, verify LAN and SPA traffic indications, then test configured reports, controls and engineering access from the station system.
Trusted by 5,000+ plants worldwide | Backed by our vast inventory of top-tier control parts, modules and cards, fast shipments are dispatched to cover your urgent needs. ABOUT US >>
Disclaimer: We are not an authorized distributor or distributor of the product manufacturer of this website, The product may have older date codes or be an older series than that available direct from the factory or authorized dealers. Because our company is not an authorized distributor of this product, the Original Manufacturer`s warranty does not apply.While many DCS PLC products will have firmware already installed, Our company makes no representation as to whether a DSC PLC product will or will not have firmware and, if it does have firmware, whether the firmware is the revision level that you need for your application. Our company also makes no representations as to your ability or right to download or otherwise obtain firmware for the product from our company, its distributors, or any other source. Our company also makes no representations as to your right to install any such firmware on the product. Our company will not obtain or supply firmware on your behalf. It is your obligation to comply with the terms of any End-User License Agreement or similar document related to obtaining or installing firmware.

Product Browsing History

We’re Here When You Need Us

From product insights to customer service needs, our experienced service team will focus on getting you what you need quickly

Enquire

Complete our online form.

Call Us

Speak to one of our team.

Live Chat

Send us a message.