The HMI must remain matched to the MCGS project, runtime version, controller protocol and every connected serial, Ethernet and USB interface. Commissioning restores communications, screen navigation, alarms, data entry and project retention before release.
Important Notice: Confirm TPC1062K, MCGS project and runtime, 24 Vdc supply, protective earth, RS-232/RS-485 wiring, USB use, Ethernet addressing, PLC protocol and controlled operator-interface test evidence before commissioning.
MCGS TPC1062K Manuals & Downloads
These documents are different: the first consolidates model-specific technical and system data; the second provides separate installation, connection, commissioning and acceptance checks.