Confirm detector selection, air-switch transfer, damper confirmations and valve timing as separate commissioning checkpoints before enabling continuous burner duty.
Important Notice: Match the complete MOD 43-35 identity, supply rating, selector position, base wiring and burner sequence before energization.
The Technical Reference consolidates the 43-35 timing programme, electrical ratings, detector choices and burner interfaces. The Installation & Commissioning Guide organizes isolation, wiring checks, staged start-up and lockout testing.